The cabinets came in and the workers started putting them up. I think it looks really great so far. I picked out the bamboo flooring. I love how it turned out.
The kitchen sans a refrigerator, microwave and dishwasher.
From the education room to the hallway and coat closet.
The table and chair storage.
The office
Hallway going into the pharmacy area.
Shannon looking over the work and progress.
One of the bathrooms. We still need all the kick boards throughout the pharmacy and artwork, but so far, so good.
We have the pharmacy inspection next week so we're really under the gun to get things ready and perfect. The drive through window arrived last night, so that is the next step. Whew! So much going on!
We also ordered our delivery vehicle yesterday. A silver 2012 Subaru Impreza hatchback. Should be here in 8 weeks!
We also ordered our delivery vehicle yesterday. A silver 2012 Subaru Impreza hatchback. Should be here in 8 weeks!